How To Fix FARR_INFLIGHT_CHECK041 - C26 : erreur de modification de contrat pour l'OP &1 dans le contrat &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_INFLIGHT_CHECK -

  • Message number: 041

  • Message text: C26 : erreur de modification de contrat pour l'OP &1 dans le contrat &2

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Contract change can either be:
    Contract modification
    Change of estimates.
    Depending on the Customizing (
    <DS:SIMG.FARR_VC_ACCT_PR>Configure Accounting Principle-specific
    Settings</>) for a company code and accounting principle, one or the
    other is applied when the scope of a contract is changed.
    The change mode for a POB is determined by the field CHANGE_MODE (only
    in the buffer, not written to database) and can be one of the following:
    'P' or 'V' prospective change
    'R' retrospective change
    ' ' (empty) no change
    Prospective change
    When a POB has change mode 'P' or 'V', then it must also have the
    following flag:
    HAS_PRO_CHANGE = X
    unless it is newly created (CRT_FLAG = X). The POB must also have a
    corresponding record inserted into the database table FARR_D_CHANGE_TYPE
    with the following flag:
    PRO_EFFECTED = X
    again, unless it is newly created.

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.

    Retrospective change
    When a POB has change mode 'R', then the field HAS_PRO_CHANGE must be
    empty.
    The POB must also have a corresponding record inserted into the database
    table FARR_D_CHANGE_TYPE with the field PRO_EFFECTED being empty.
    Negative example:
    The performance obligation POB1 has a prospective change but the field
    CHANGE_MODE determines a retrospective change.
    POB ID,,CHANGE_MODE,,HAS_PRO_CHANGE
    POB1,,R,,X
    The check is not performed for POBs with CHANGE_MODE = ' '.
    Buffers checked:
    POB data buffer : MTS_POB_DATA_BUFFER
    Change type data buffer: MTS_CHANGE_TYPE_BUFFER

    Réponse du système

    The RAI processing is stopped or the manual transaction from the UI is
    stopped.

    Comment corriger cette erreur?

    You can search for SAP notes related to inflight check C26 by using the
    terms FARR_INFLIGHT_CHECK and C26.
    You can also check if there is inconsistent data already in the system.

    Procédure pour les administrateurs système


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP FARR_INFLIGHT_CHECK041 - C26 : erreur de modification de contrat pour l'OP &1 dans le contrat &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author