Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_CONTRACT_MAIN844 - Impossible de modifier le type de réalisation &1 de l'OP &2 en &3.


FARR_CONTRACT_MAIN844 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 844

  • Message text: Impossible de modifier le type de réalisation &1 de l'OP &2 en &3.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    If fulfillment has already happened, the system checks the following:
    (1) Fulfillment type of the performance obligation can only be changed
    between T (Time-Based) and O (Percentage of Completion).
    (2) You cannot change E (Event-based) to other fulfillment type and you
    cannot change other fulfillment type to E either.
    (3) You cannot change the fulfillment type between T(Time-Based) with
    start date type 3 (Is Always the Event Data) and O (Percentage of
    Completion).

    Réponse du système

    The system prevents the change to the performance obligation.

    Comment corriger cette erreur?

    Specify a different fulfillment type.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


FARR_CONTRACT_MAIN844 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker