How To Fix FARR_CONTRACT_MAIN132 - Impossible de modifier le type de date début d'OP &1 de &2 en &3.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 132

  • Message text: Impossible de modifier le type de date début d'OP &1 de &2 en &3.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    When you change the start date type, the system checks the following:
    (1) For a Time-Based POB, you cannot change the start date type to 3 (Is
    Always the Event Date).
    (2) If fulfillment has already happened for a POB with start date type
    3, you cannot change the start date type to 1 (Available on Creation of
    Performance Obligation) or 2 (Available After Creation of Performance
    Obligation).

    Réponse du système

    The system prevents the change from being saved.

    Comment corriger cette erreur?

    Specify a different start date type.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP FARR_CONTRACT_MAIN132 - Impossible de modifier le type de date début d'OP &1 de &2 en &3. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant