Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_CONTRACT_MAIN089 - L'obligation de prestation &2 ne peut inclure type condition réservé &1.


FARR_CONTRACT_MAIN089 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 089

  • Message text: L'obligation de prestation &2 ne peut inclure type condition réservé &1.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    When creating or updating a performance obligation, the back-end
    operational system (the system that originates the performance
    obligation, such as a logistics system) included a condition type that
    is reserved for carrying allocation differences. This may have occurred
    because of an incorrect configuration in the back-end operational
    system.

    Réponse du système

    The operation to create or update the performance obligation was
    terminated.

    Comment corriger cette erreur?

    Contact your system administrator.

    Procédure pour les administrateurs système

    Once you have configured &V1& as the allocation difference condition
    type, you must not use it for other purposes.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


FARR_CONTRACT_MAIN089 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant