Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 112
Message text: Il existe des pièces spécifiques au ledger des compos. Gest. trés./Prêt
You want to switch the leading ledger.
However, the system contains ledger-specific documents for the <LS>
Treasury and Risk Management (TRM)</> and/or <LS>Loans Management
(FS-CML)</> components.
If this message appears as an error message, you <ZH>cannot</> carry out
a project for switching the leading ledger.
However, after carefully considering the effects and risks, you can
change the message type from <LS>error</> to <LS>warning</> (see section
"&SYS_ADMIN&").
If you are using the <LS>Treasury and Risk Management (TRM)</> and/or
<LS>Loans Management (FS-CML)</> components productively with a ledger
solution (that is, the values are updated in parallel ledgers), it is
<ZH>not</> possible to switch the leading ledger due to the architecture
of the <LS>Treasury and Risk Management (TRM)</> and <LS>Loans
Management (FS-CML)</> components on one hand and the <LS>Financial
Accounting (FI)</> component on the other.
This is because the leading ledger is used as an operational paying
ledger and a paying valuation area is defined in the transaction manager
of TRM. In the case of a switch of the leading valuation, time-dependent
changes would have to be made to this setting from the date of the
switch. However, this is <ZH>not</> possible when the leading ledger is
switched.
INCLUDE FAGL_MESSAGE_CONTROL OBJECT DOKU ID TX
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FAGL_SWITCH_LEAD_LDG112
- Il existe des pièces spécifiques au ledger des compos. Gest. trés./Prêt ?Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG111
Fin d'exercice comptable &1 divergente : &2 &3
Quelle est la cause de ce problème? Different fiscal year variants are defined for the ledgers to be switched. The end of the fiscal year &V1&a...
FAGL_SWITCH_LEAD_LDG110
Début d'exercice comptable &1 divergente : &2 &3
Quelle est la cause de ce problème? Different fiscal year variants are defined for the ledgers to be switched. The start of the fiscal year &V1...
FAGL_SWITCH_LEAD_LDG113
Le scénario &1 n'est pas affecté au ledger &2.
Quelle est la cause de ce problème? Scenario &V1& is assigned in the leading ledger but not in the future leading ledger &V2&. Tech...
FAGL_SWITCH_LEAD_LDG114
Echange du ledger principal impossible ; FI-AA (nouv.) non active
Quelle est la cause de ce problème? In order for you to change the leading ledger, the following prerequisites in <LS>Asset Accounting</&g...
Cliquez sur ce lien pour rechercher tous les messages SAP.