Do you have any question about this error?
Message type: E = Error
Message class: FAGL_REORGANIZATION - Reorganization
Message number: 803
Message text: La période précédente de la société &1 est encore en cours.
For company code &V1&, period &V3& in fiscal year &V2& is still open.
However, the reorganization is supposed to begin in the period after
that.
The reassignment cannot be made until the previous period is closed.
Note:
In the case of a posting period that always needs to be open, there must
be a minimum entry (<LS>account type</> <ZH>+</>) in the <LS>Financial
Accounting Global Settings</> under <LS>Open and Close Posting Periods
</>. This minimum entry was found for company code &V1& in period &V3&/
&V2&.
<ZH>&EXAMPLE&</>
This example seeks to demonstrate the type of inconsistency that can
arise if the previous period remains open or is reopened after the
reassignment.
Scenario: Profit center A needs to be combined with profit center B by
June 1 of the current year. This combination should result in the
creation of the new profit center C.
Previously, profit center A was assigned to material MAT1 in plant 0001.
Consequently, MAT1 is included in the reorganization. Period 5 is closed
on June 10. Then, as part of the reorganization, the master data is
reassigned and the balances are transferred. After the reorganization,
profit center C is assigned to material MAT1.
Five days later, a good receipt needs to be posted for material MAT1 in
period 5. Period 5 is reopened and the goods receipt is posted. Since
the assignment of the profit center to the material/plant is <ZH>not</>
time-dependent, the goods receipt is posted in period 5 to the new
profit center C. However, postings cannot be made to profit center C
before period 6.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Make the reassignment after the previous period has been closed.
INCLUDE FAGL_MESSAGE_CONTROL OBJECT DOKU ID TX
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FAGL_REORGANIZATION803
- La période précédente de la société &1 est encore en cours. ?Get instant SAP help. Start your 7-day free trial now.
FAGL_REORGANIZATION802
La date de réorganisation doit être le premier jour d'une période compt.
Quelle est la cause de ce problème? The <DS:GLOS.4991472831D64651E10000000A421948>reorganization date</> must be the first day of a pos...
FAGL_REORGANIZATION801
Les objets de la société &2 ne sont pas autorisés.
Quelle est la cause de ce problème? The affected company codes are derived from the controlling area specified in the reorganization plan. Fiscal y...
FAGL_REORGANIZATION804
La période de réorganisation est déjà en cours pour société &1.
Quelle est la cause de ce problème? You want to create a new <DS:DE.FAGL_R_PLAN>reorganization plan</> or make changes to the general o...
FAGL_REORGANIZATION805
Les délimitations ne peuvent plus être modifiées.
Quelle est la cause de ce problème? You want to change the general or specific restrictions. However, reorganization period &V2&/&V3&am...
Cliquez sur ce lien pour rechercher tous les messages SAP.