How To Fix EB114 - Le montant &2 &3 du document &1 n'a pu être réparti


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EB - IS-U invoicing

  • Message number: 114

  • Message text: Le montant &2 &3 du document &1 n'a pu être réparti

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The amount you have specified is the clearing amount that is allotted
    to a collective bill or an installment plan &V1&. This amount must be
    distributed over the items belonging to the collective bill or the
    installment plan by a settlement variant that is allocated to
    settlement type &V4& and the settlement category of the contract
    account.
    The clearing cannot be posted for one of the following reasons:
    You have not used the correct settlement variant for this business
    process.
    A settlement variant could not be determined.

    Réponse du système

    Comment corriger cette erreur?

    Check the table settings for the settlement control.
    The settlement variant used must ensure that the entire amount
    available can be distributed over the items of the collective bill or
    installment plan.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP EB114 - Le montant &2 &3 du document &1 n'a pu être réparti ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker