How To Fix DPR_SHARED216 - &1 &2 : conflit date de début fixe/réelle avec date d'un successeur.


DPR_SHARED216 - Overview

  • Message type: E = Error

  • Message class: DPR_SHARED - Development Projects: Messages for Shared Objects

  • Message number: 216

  • Message text: &1 &2 : conflit date de début fixe/réelle avec date d'un successeur.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    During backward scheduling of the project element, the system calculated
    a start from a successor relationship and the duration of the project
    element. The start is before the fixed start or before the actual start
    of the project element.

    Réponse du système

    The system ignores the successor relationship and uses the fixed start
    or the actual start as the calculated start of the project element.
    The system calculates the finish from this date using the duration of
    the project element.

    Comment corriger cette erreur?

    Check whether the fixed start or actual start is realistic.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


DPR_SHARED216 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.