Do you have any question about this error?
Message type: E = Error
Message class: DPR_FIN_GECCO - Messages for Accounting Integration
Message number: 006
Message text: Ce projet n'est pas défini dans la gestion comptable
The project was not transferred to the Accounting system yet. Possible
causes are:
An error occurred during replication.
There was a time lag between the time when the project was saved and
when the cost collector was created in Controlling.
It is also possible that the Accounting system is not available at this
time. This is indicated by the corresponding error message in the log.
The system could not provide any data or functions in the Accounting
system.
Recheck whether the Accounting system has recognized the project in the
meantime.
Use the Controlling Cockpit to analyze errors that could have occurred
when transferring the project and correct them. Then create the cost
collector in the Controlling Cockpit again.
If you cannot create the project in the Controlling Cockpit again,
rereplicate the project by setting the status <LS>Flag for Replication
</> for the project definition in Project Management .
If you are still unable to correct the error even after carrying out
these steps, contact your system administrator.
If the Accounting system is not currently available, correct the cause
of this.
Once the Accounting system is available note the following:
The transfer of the project to the Accounting system is done per qRFC
(queued Remote Function Call). This technique ensures that the transfer
occurrs sequentially. However, if an error occurs in the target system,
the system does not continue to transfer and the queue hangs.
It is also possible that an error occurred when the project was
transferred. Use the transaction SMQ1 to analyze the queue <LB>
CPROJECTS_FIN_GECCO</>. With this transaction you can display the queue
status and restart it once the cause of the error has been found and
corrected.
You can also delete LUWs (Logical Units of Work) belonging to this
queue. However, note that this transfer is lost and you must retransfer
the project belonging to this LUW.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
DPR_FIN_GECCO006
- Ce projet n'est pas défini dans la gestion comptable ?Get instant SAP help. Start your 7-day free trial now.
DPR_FIN_GECCO005
Date du CCR : &1
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
DPR_FIN_GECCO004
Les options de l'intégration de la gestion comptables sont erronées
Quelle est la cause de ce problème? Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreu...
DPR_FIN_GECCO007
Ce projet n'a aucun élément à calculer.
Quelle est la cause de ce problème? The following elements are selected from the project for costing: <ZK>Project participants or roles</&...
DPR_FIN_GECCO008
Sélectionnez les objets à transférer.
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.