How To Fix DPR_FIN_GECCO006 - Ce projet n'est pas défini dans la gestion comptable


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_FIN_GECCO - Messages for Accounting Integration

  • Message number: 006

  • Message text: Ce projet n'est pas défini dans la gestion comptable

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The project was not transferred to the Accounting system yet. Possible
    causes are:
    An error occurred during replication.
    There was a time lag between the time when the project was saved and
    when the cost collector was created in Controlling.
    It is also possible that the Accounting system is not available at this
    time. This is indicated by the corresponding error message in the log.

    Réponse du système

    The system could not provide any data or functions in the Accounting
    system.

    Comment corriger cette erreur?

    Recheck whether the Accounting system has recognized the project in the
    meantime.
    Use the Controlling Cockpit to analyze errors that could have occurred
    when transferring the project and correct them. Then create the cost
    collector in the Controlling Cockpit again.
    If you cannot create the project in the Controlling Cockpit again,
    rereplicate the project by setting the status <LS>Flag for Replication
    </> for the project definition in Project Management .
    If you are still unable to correct the error even after carrying out
    these steps, contact your system administrator.

    Procédure pour les administrateurs système

    If the Accounting system is not currently available, correct the cause
    of this.
    Once the Accounting system is available note the following:
    The transfer of the project to the Accounting system is done per qRFC
    (queued Remote Function Call). This technique ensures that the transfer
    occurrs sequentially. However, if an error occurs in the target system,
    the system does not continue to transfer and the queue hangs.
    It is also possible that an error occurred when the project was
    transferred. Use the transaction SMQ1 to analyze the queue <LB>
    CPROJECTS_FIN_GECCO</>. With this transaction you can display the queue
    status and restart it once the cause of the error has been found and
    corrected.
    You can also delete LUWs (Logical Units of Work) belonging to this
    queue. However, note that this transfer is lost and you must retransfer
    the project belonging to this LUW.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP DPR_FIN_GECCO006 - Ce projet n'est pas défini dans la gestion comptable ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.