Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 724
Message text: Ordre & : l'opération & débute dans le passé
The system is to dispatch an operation.
The indicator <ZH>Indicator forwards</> is not set in the
strategy profile in Customizing for Capacity Planning. That means that
the systems looks for a possible dispatch date in the <ZH>past</>.
The latest start that has been located lies in the past.
Either dispatch the operation manually or
select a strategy profile with the planning direction <ZH>forwards</>,
and dispatch the operation again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CY724
- Ordre & : l'opération & débute dans le passé ?Get instant SAP help. Start your 7-day free trial now.
CY723
Ordre & : opération & située en dehors de la marge de sécurité
Quelle est la cause de ce problème? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy p...
CY722
Ordre & : opé. & en dehors marge avant prod. + marge d'opération
Quelle est la cause de ce problème? An operation is to be dispatched so that it lies outside the float before production and the operation float. H...
CY725
& n'appartient pas au réseau de ressources & dans division &
Quelle est la cause de ce problème? The header data of the process order specifies that the operations on resource network structure &V2& a...
CY726
& n'a pas de liaison avec prédécesseur & dans réseau de ress. & div.&
Quelle est la cause de ce problème? The header data of the process order specifies that the operations must be scheduled on a particular resource n...
Cliquez sur ce lien pour rechercher tous les messages SAP.