Do you have any question about this error?
Message type: E = Error
Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan
Message number: 515
Message text: Les calendriers de factur. ne sont pas synchrones !
The periodicities of the service billing plan and the usage billing plan
are not synchronous.
If you want to allocate a contract to a pool contract, you have to make
sure that the periodicity of the allocated contract is synchronous with
the periodicity of the pool contract.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Check the synchronicity within a service contract. If you want to create
a pool linkage, check the synchronicity between the single contract and
the pool contract.
<ZH>Synchronicity within a service contract</>
The billing period of the usage must be synchronous with the billing
period of the service, which means each start and end date of a usage
billing must agree with a start and end date of a service billing.
If the service is billed on the first of each month, for example, and
usage is billed quarterly on the first of the month, the billing periods
are synchronous. If you want to allocate a contract to a pool contract,
create the pool link analog to the usage billing (as of April 1, 2004,
for example).
<ZH>Synchronicity between a contract and a pool contract</>
When you allocate a contract to a single pool contract, the periodicity
of the assigned contract must agree with the usage periodicity of the
single pool contract, which means each start and end date of a usage
billing must agree with a start and end date of a service billing.
Therefore, you can usually only define a pool linkage at the start of a
usage period.
When you allocate a contract to an aggregate contract, the usage
periodicity of the aggregate contract must be synchronous with the
allocated contract, which means the start and end date of each period in
the aggregate contract has to agree with the start and end date of the
service billing plan of the assigned contract. Therefore, you can
usually only define a pool linkage at the start of a service period.
If you want to terminate a pool linkage, the termination date has to
agree with the period end date of the usage. This rule does not apply to
the first and last periods of the usage billing plan.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CRM_BILLPLAN_UBB515
- Les calendriers de factur. ne sont pas synchrones ! ?Get instant SAP help. Start your 7-day free trial now.
CRM_BILLPLAN_UBB514
Imposs. déterminer type période pr type période &1 avec événement &2 &3
Quelle est la cause de ce problème? The system could not deterine a billing period type because the combination of period type and process events i...
CRM_BILLPLAN_UBB513
Pas de types service correspondants pour liaison pool actuelle
Quelle est la cause de ce problème? You tried to link a contract to a pool contract. Reading the relevant service types did not find any entries, h...
CRM_BILLPLAN_UBB516
Date régularisation non valable pour contrat pool affecté
Quelle est la cause de ce problème? The accrual date lies outside of the validity period of the pool contract for the linkage with a contract.Répo...
CRM_BILLPLAN_UBB517
Imposs. déterminer date calendrier facturation pour date régularisation
Quelle est la cause de ce problème? Internal error determining a line entry in the billing plan (BILLPLAN_D).Réponse du système Le système éme...
Cliquez sur ce lien pour rechercher tous les messages SAP.