Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 268
Message text: Besoin indépendant prévisionnnel introuvable pour &1 au &2.
You have changed the requirements date for a planned independent
requirement for material &v1&.
The system cannot determine any planned independent requirements for
the original requirements date &V2&. Therefore it cannot consume the
requirements for the old date.
Due to the change, the system has created planned independent
requirements for the new date, so that there is a risk that the
requirements may exist twice.
Check the current stock/requirements situation for material &v1&.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CN268
- Besoin indépendant prévisionnnel introuvable pour &1 au &2. ?Get instant SAP help. Sign up for our Free Essentials Plan.
CN267
Le blocage du réseau & a été annulé.
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
CN266
Réseau & bloqué.
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
CN269
L'élément d'OTP & ne gère pas de stock projet valorisé
Quelle est la cause de ce problème? You want to change the assignment of a component to a WBS element. However, as opposed to the original WBS elem...
CN270
Le composant n'est affecté à aucun stock individuel valorisé
Quelle est la cause de ce problème? Unit costing is only possible for material components that have been allocated to valuated individual stocks.Ex...
Cliquez sur ce lien pour rechercher tous les messages SAP.