Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CN268 - Besoin indépendant prévisionnnel introuvable pour &1 au &2.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 268

  • Message text: Besoin indépendant prévisionnnel introuvable pour &1 au &2.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have changed the requirements date for a planned independent
    requirement for material &v1&.

    Réponse du système

    The system cannot determine any planned independent requirements for
    the original requirements date &V2&. Therefore it cannot consume the
    requirements for the old date.
    Due to the change, the system has created planned independent
    requirements for the new date, so that there is a risk that the
    requirements may exist twice.

    Comment corriger cette erreur?

    Check the current stock/requirements situation for material &v1&.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CN268 - Besoin indépendant prévisionnnel introuvable pour &1 au &2. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker