Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 736
Message text: Aucun CCR pour l'alternative d'approvisionnement
For material/plant &v1&, no cost estimate could be found for the
<DS:GLOS.352A616EC1035CD5E10000009B38F974>procurement alternative</>
with <DS:GLOS.3526C38DAFAB52B9E10000009B38F974>production version</>
&v2&.
There are various possible causes for this, as follows:
You have not created a procurement alternative for production version
&V2&.
Example:
At the beginning of the year, you create a
<DS:GLOS.3526B72EAFAB52B9E10000009B38F974>mixed cost estimate</> with
procurement alternatives A und B. Procurement alternative A includes
production version 1, while procurement alternative B includes
production version 2. During the fiscal year, you enter production
version 3, for which you create a
<DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</>.
When calculating actual costs at period-end closing in Cost Object
Controlling, the system attempts to access the cost estimate for the
procurement alternative. However, there is no procurement alternative
containing production version 3.
A cost estimate was not created for production version &V2&. The reason
for this is that the lot size range entered in the production version
does not agree with the lot size entered in the procurement
alternative.
Example:
The ratio between procurement alternative A and procurement alternative
B in a mixed cost estimate for material X should be 1:9.
Procurement alternative A contains production version 1.
A lot size range of 100 - 1000 has been entered for production version
1. No lot size has been entered in the procurement alternative.
Procurement alternative A contains production version 2.
A lot size range of 1 - 100 has been entered for production version 2.
No lot size has been entered in the procurement alternative.
You create a mixed cost estimate for the material with a lot size of 1.
The system costs production version 2. Production version 1 is not
costed, because the lot size range of the production version does not
correspond to the costing lot size of the procurement alternative.
Therefore, procurement alternative A has a cost estimate that is based
on production version 2.
This would also occur if a lot size of 500 were entered in procurement
alternative A, and the costing lot size of the procurement alternative
were 100.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Check to see whether a cost estimate already exists for the procurement
alternative.
Check the lot sizes in the production version and in the procurement
alternative.
If necessary, create a procurement alternative and/or a cost estimate
for the procurement alternative.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK736
- Aucun CCR pour l'alternative d'approvisionnement ?Get instant SAP help. Start your 7-day free trial now.
CK735
Aucun CCR pour l'alternative d'approvisionnement
Quelle est la cause de ce problème? For material/plant &v1&, no cost estimate could be found for the <DS:GLOS.352A616EC1035CD5E10000009B...
CK734
Incohérence lors du CCR mixte de l'art. & dans la division &
Quelle est la cause de ce problème? When referencing a cost estimate for material &v1& in plant &V2&, the cost estimate for procure...
CK737
Le co-produit & de la division & n'est pas généré par l'art. process
Quelle est la cause de ce problème? It was specified that costing for material &V1& in plant &V2& would be carried out through lead...
CK738
Les saisies rel. à la struct. de qtés sont ignorées lors d'un CCR mixte
Quelle est la cause de ce problème? You have entered quantity structure data (production version, BOM data, routing data, and lot size) in the init...