Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 557
Message text: Le lancement de la période compt. &1 &2 est effectué trop tôt
You are attempting to release a standard cost estimate for posting
period &v1& of fiscal year &v2&. However, the system has determined
that a standard cost estimate has been marked for posting period &v3&
&v4& in the material master (costing view). This period has not yet
been reached.
The standard cost estimate is not released.
You have two options:
Wait until posting period &v3& of fiscal year &v4& to release the
standard cost estimate.
Create a new standard cost estimate for posting period &v1& &v2&, mark
this cost estimate for period &v1& &v2&, and release it.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK557
- Le lancement de la période compt. &1 &2 est effectué trop tôt ?Get instant SAP help. Start your 7-day free trial now.
CK556
Le lancement de la période compt. &1 &2 est effectué trop tard
Quelle est la cause de ce problème? You are attempting to release a standard cost estimate for posting period &v1& of fiscal year &v2&a...
CK555
La division &3 n'a pas pu être trouvée
Quelle est la cause de ce problème? You are attempting to release the standard cost estimate of material &v1& in plant &v3& for a f...
CK558
La destination &1 n'est pas disponible
Quelle est la cause de ce problème? Before starting the costing run, the system checks whether all destinations that were maintained in Customizing...
CK559
Co-produits & non pris en compte dans le CCR
Quelle est la cause de ce problème? The relevancy to costing indicator is not set for co-product &V1&.Réponse du système The planned cos...
Cliquez sur ce lien pour rechercher tous les messages SAP.