Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 524
Message text: CCR budgété sur l'ancre fiche article non cohérent
The following was established within &v3&:
You are attempting to mark the standard cost estimate of material &v1&
in plant &v2& for a future posting period. The system has discovered
inconsistent data during this process.
The internal cost estimate number of this standard cost estimate is not
the same as the cost estimate number of the material.
The data inconsistency was probably caused by the number ranges being
manipulated or by inconsistent data transfer.
The data inconsistency affects the standard cost estimate that has
already been marked at an earlier time point (see future material
master anchor).
You can repair the data inconsistency as follows:
Create the costing segment again.
Carry out the standard cost estimate for the future posting period
again, and then mark this standard cost estimate for the future posting
period again.
If the costing segment cannot be created again because of updated data,
remove from the system the already-marked standard cost estimate (see
future material master anchor) whose internal costing number is
referencing an incorrect material (such as by
<DS:GLOS.reorganization>reorganizing</>). Then cost and mark as
described above.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK524
- CCR budgété sur l'ancre fiche article non cohérent ?Get instant SAP help. Sign up for our Free Essentials Plan.
CK523
CCR budgété incohérent dans la période comptable &4
Quelle est la cause de ce problème? In &v3&, the following was established: You are attempting to mark the standard cost estimate for mater...
CK522
Valor. séparée pr fabr. int. n'a pas valeur d'engagement
Quelle est la cause de ce problème? You are attempting to release the standard cost estimate of a material. However, split valuation is not defined...
CK525
Le CCR budgété marqué ou débloqué dans le système n'est pas cohérent
Quelle est la cause de ce problème? Material &v1&, valuation area &v2&, valuation type &v3&: The marked (future), released ...
CK526
Le CCR de l'article &1, périmètre de valorisation &2 est bloqué
Quelle est la cause de ce problème? The cost estimate for material &v1&, valuation area &v2&, valuation type &v3& is locked...
Cliquez sur ce lien pour rechercher tous les messages SAP.