How To Fix CK214 - Pas de calcul du CR budgété actif


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 214

  • Message text: Pas de calcul du CR budgété actif

  • Show details Hide details
  • Quelle est la cause de ce problème?

    There is no active <GL:Plankalkulation>Standard Cost Estimate</> on &V1&
    for material &V2& in plant &V3&.
    The standard cost estimate only becomes active when the costing results
    are marked and released in the material master record.

    Comment corriger cette erreur?

    Check your entry.
    Create a standard cost estimate for the material if necessary.
    If there is data in production planning and control, then create a
    <DS:GLOS.Kalkulation_mit_Mengengernst>Cost Estimate with Quantity
    Structure</>.
    <DS:TRAN.CK11N>Create Cost Estimate with Quantity Structure</>
    If there is no such data, create a
    <DS:GLOS.Kalkulation_ohne_Mengengernst>Cost Estimate Without Quantity
    Structure</>.
    <DS:TRAN.KKPAN>Create Cost Estimate Without Quantity Structure</>
    Mark the standard cost estimate.
    <DS:TRAN.CK24>Marking Standard Cost Estimates</>
    Release the standard cost estimate.
    <DS:TRAN.CK24>Releasing Standard Cost Estimates</>

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CK214 - Pas de calcul du CR budgété actif ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author