How To Fix CK214 - Pas de calcul du CR budgété actif


CK214 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 214

  • Message text: Pas de calcul du CR budgété actif

  • Show details Hide details
  • Quelle est la cause de ce problème?

    There is no active <GL:Plankalkulation>Standard Cost Estimate</> on &V1&
    for material &V2& in plant &V3&.
    The standard cost estimate only becomes active when the costing results
    are marked and released in the material master record.

    Comment corriger cette erreur?

    Check your entry.
    Create a standard cost estimate for the material if necessary.
    If there is data in production planning and control, then create a
    <DS:GLOS.Kalkulation_mit_Mengengernst>Cost Estimate with Quantity
    Structure</>.
    <DS:TRAN.CK11N>Create Cost Estimate with Quantity Structure</>
    If there is no such data, create a
    <DS:GLOS.Kalkulation_ohne_Mengengernst>Cost Estimate Without Quantity
    Structure</>.
    <DS:TRAN.KKPAN>Create Cost Estimate Without Quantity Structure</>
    Mark the standard cost estimate.
    <DS:TRAN.CK24>Marking Standard Cost Estimates</>
    Release the standard cost estimate.
    <DS:TRAN.CK24>Releasing Standard Cost Estimates</>

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CK214 - Pas de calcul du CR budgété actif ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant