How To Fix CK146 - Il n'existe pas de variante de CCR budgété


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 146

  • Message text: Il n'existe pas de variante de CCR budgété

  • Show details Hide details
  • Quelle est la cause de ce problème?

    There is no longer a costing variant for the standard cost estimate in
    the system.

    Réponse du système

    The system cannot mark the standard cost estimate.
    &sys_admin&
    Go into Customizing for Product Cost Planning (cost estimate with
    quantity structure) and create a costing variant for the standard cost
    estimate. This costing variant must be linked to a costing type for the
    standard cost estimate in which the 'Update standard price' option is
    set.
    This costing variant enables you to execute and save the cost estimate
    again for the future posting period. The procedure for marking this
    standard cost estimate for the future posting period should then be
    repeated.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CK146 - Il n'existe pas de variante de CCR budgété ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author