Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 146
Message text: Il n'existe pas de variante de CCR budgété
There is no longer a costing variant for the standard cost estimate in
the system.
The system cannot mark the standard cost estimate.
&sys_admin&
Go into Customizing for Product Cost Planning (cost estimate with
quantity structure) and create a costing variant for the standard cost
estimate. This costing variant must be linked to a costing type for the
standard cost estimate in which the 'Update standard price' option is
set.
This costing variant enables you to execute and save the cost estimate
again for the future posting period. The procedure for marking this
standard cost estimate for the future posting period should then be
repeated.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK146
- Il n'existe pas de variante de CCR budgété ?Get instant SAP help. Start your 7-day free trial now.
CK145
Erreur système lors du blocage de l'article
Quelle est la cause de ce problème? A system error occurred while the material was being locked.Réponse du système Le système émet un message ...
CK144
Fiche article bloquée par un autre utilisateur
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
CK147
Pas de schéma d'éléments trouvé pour le calcul du CR budgété
Quelle est la cause de ce problème? Standard cost estimates are saved under a certain <DS:GLOS.cost_component_structure>cost component struct...
CK148
Art. &v1& div. &v3& : dépassement de zone dans le prix standard futur
Quelle est la cause de ce problème? The future standard price exceeds the capacity of the field in the master record of material &v1& in pl...
Cliquez sur ce lien pour rechercher tous les messages SAP.