Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 015
Message text: Pas de stratégie valable pr &1 &2 &4 avec var. de valoris. &3
If the system issued a warning message or an information message, the
costing item will be included in costing with a value of zero.
In material costing, if the system issues an error message, the costing
status is set to <ZH>KF</> (costed with errors).
If the system issued a termination message, costing cannot be
continued.
If you have authorization to do so, go into Customizing and check
whether the corresponding prices have been maintained:
<DS:TRAN.MM02>Check material price</>
<DS:TRAN.KL03>Check internal activity price</>
<DS:TRAN.ME12>Check external activity price</>
&sys_admin&
If you have authorization for Customizing, maintain the settings for
valuation variant &v3&.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK015
- Pas de stratégie valable pr &1 &2 &4 avec var. de valoris. &3 ?Get instant SAP help. Start your 7-day free trial now.
CK014
Erreur lors conversion date de CCR --> période comptable
Quelle est la cause de ce problème? Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreu...
CK013
Variante de valorisation & inexistante (vérifiez votre entrée)
Quelle est la cause de ce problème? <DS:GLOS.valuation_variant>Valuation variant</> &V1& has not been maintained.Comment corrig...
CK016
Appel incorrect de la valorisation des activités dans RKIN
Quelle est la cause de ce problème? A transfer parameter was incorrect (sy-subrc = &V1&)Comment corriger cette erreur? Contact your system...
CK017
Aucun prix std prévu pr centre & périm.ana. & TA &
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.