How To Fix CJ441 - Veuillez traiter l'intégralité de l'affectation de sous-projets


CJ441 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 441

  • Message text: Veuillez traiter l'intégralité de l'affectation de sous-projets

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have assigned individual WBS elements to subprojects; however, you
    must assign <ZH>each</> WBS element to a subproject in order to have an
    accurate evaluation in the project information system.

    Réponse du système

    If you are working with a standard WBS this is only an informational
    message. The system will still save the WBS.
    If you are working with a operative work breakdown structure the system
    will not save the WBS.

    Comment corriger cette erreur?

    Change the assignments to subprojects. To do this, on the detail
    screens, select the <LS>Organisation</> tab page and either assign
    every WBS element to a subproject or remove the subproject assignment
    from the individual WBS elements.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


CJ441 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker