Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 413
Message text: Décalage devant l'élément initial impossible
You have selected only a portion of the project and have attempted to
shift elements before the initial element. This is not possible. Only
changes to the hierarchy below the initial element are allowed.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Select either the entire project or a part of the hierarchy that begins
above the current initial element. Maintain only the project definition
or a WBS element superior to the current initial element &V1& on the
initial screen.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CJ413
- Décalage devant l'élément initial impossible ?Get instant SAP help. Start your 7-day free trial now.
CJ412
& élts d'OTP n'ont pas pu être mis au niv. supérieur
Quelle est la cause de ce problème? You cannot level up the WBS elements you have selected. If you want to level up WBS elements, you must consider...
CJ411
& élts d'OTP n'ont pas pu être mis au niv. inférieur
Quelle est la cause de ce problème? You have selected WBS elements which cannot be leveled down. If you want to level down from these WBS elements ...
CJ414
Couper uniq. possible lors sélection du projet complet
Quelle est la cause de ce problème? You attempted to separate a WBS element or a sub-hierarchy from the entire work breakdown structure. You can on...
CJ415
L'élément initial ne peut pas être supprimé
Quelle est la cause de ce problème? When you entered WBS element &V1& you selected that portion of the WBS which belongs to this WBS elemen...
Cliquez sur ce lien pour rechercher tous les messages SAP.