How To Fix CC073 - La date ne peut être reportée au &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 073

  • Message text: La date ne peut être reportée au &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You want to change the valid-from date of a change master.
    You cannot do this, because the consistency of at least one change
    object (for example, BOM, or routing) is violated or the object(s) are
    currently locked.
    The following reasons for inconsistency may apply:
    A BOM has already been changed using a change number with the same
    valid-from date as the selected date &V1&.
    A routing is not valid on the selected date &V1&.

    Réponse du système

    The system produces a message log listing the change objects that
    prevent a date shift.

    Comment corriger cette erreur?

    If you confirm this message, you can enter a new date in the <LS>Date
    shift</> dialog box or cancel the date shift function.
    If you cancel the date shift function, you see a pushbutton for the
    special message log for the change objects that prevent a date shift.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CC073 - La date ne peut être reportée au & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker