How To Fix CACSIB402 - Numéro de contrat & non géré dans organisation PD


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CACSIB - Commissions: Interface and Pending Case Processing

  • Message number: 402

  • Message text: Numéro de contrat & non géré dans organisation PD

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The commission contract &V1& is referenced in the participation for the
    commission case. This contract is not known in the commission system.

    Réponse du système

    The commission case is categorized as pending. If it was possible to
    create a commission document in spite of this error (for further
    participants, for example) the account assignment for the missing
    contract is also missing.

    Comment corriger cette erreur?

    Correct the commission contract number via processing of cases pending
    or create the commission contract and release the commission case for
    further processing.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CACSIB402 - Numéro de contrat & non géré dans organisation PD ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author