Do you have any question about this error?
Message type: E = Error
Message class: CACSAC1 - Actual Commission
Message number: 010
Message text: Erreur lors de la création du degré de réalisation
For <DS:GLOS.952325FECAF85347AB354C9B539CB977>settlement schedule item
</> &SYST-MSGV1&, sequence ID &SYST-MSGV2&, item &SYST-MSGV3&, either
the fulfillment level period has <ZH>not</> been specified (fields
FFL_FROM and/or FFL_TO), or the field GUID is blank or the object data
is incorrect.
Release rules were defined for the commission contract. However the
determination did not find any release rule for the standard contract.
Correct your Customizing for the determination of release rules or check
your individual settings for the commission contract.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CACSAC1010
- Erreur lors de la création du degré de réalisation ?Get instant SAP help. Start your 7-day free trial now.
CACSAC1009
Erreur de création du degré de réalisation pour le poste &3
Quelle est la cause de ce problème? For settlement schedule item &SYST-MSGV1&, sequence ID &SYST-MSGV2&, item &SYST-MSGV3&,...
CACSAC1008
Erreur de création des périodes de degré de réalisation pour le poste &3
Quelle est la cause de ce problème? Field FFL_BEGIN to select the first or last fulfillment level period is not filled for settlement schedule item...
CACSAC1011
Règle validation &1 av.type validation &2 pour ligne rénumérat.&3 trouvée
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
CACSAC1012
Le degré de réalisation de l'ID unique &1 n'a pas pu être lu
Quelle est la cause de ce problème? The status of the settlement schedule item is to be updated. To do this, you should transfer data for busitime ...
Cliquez sur ce lien pour rechercher tous les messages SAP.