How To Fix C2053 - Pas de besoin en capacité existant pour cette opération


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C2 - Other messages production orders

  • Message number: 053

  • Message text: Pas de besoin en capacité existant pour cette opération

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The operation does not have any capacity requirements due to one of the
    following reasons:
    There are no capacities defined at the work center at which the
    operation is carried.
    The control key of the operation specifies that no capacity
    requirementsare created.
    The operation has not been scheduled.

    Comment corriger cette erreur?

    Check the operation and the corresponding work center:
    If necessary, change the settings so that capacity requirements are
    created for the operation.
    If necessary, scheduled the order.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP C2053 - Pas de besoin en capacité existant pour cette opération ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author