How To Fix BP741 - Existence d'options différentes pour le contrôle de disponibilités


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 741

  • Message text: Existence d'options différentes pour le contrôle de disponibilités

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You would like to execute a budget distribution from the investment
    program to several capital investment measures (orders or projects).
    The individual capital investment measures have different settings with
    regard to the availability control.

    Réponse du système

    The system does not process the budget distribution.

    Comment corriger cette erreur?

    RESET N1
    Store in all subordinate capital investment measures of this capital
    investment program the same settings of the availability control. Also
    change the budget profiles belonging to it.
    <zh>Attention:</>
    Changes to a budget profile can have affects on further order orders or
    projects to which the budget profile is likewise assigned.
    Reconstruct for all orders and projects for which you have changed the
    profile and which are already budgeted the "Assigned values".
    For this choose in the Implementation Guide of the project system or of
    the overhead cost orders the work step "Reconstruct availability
    control".

    Comment cela peut-il arriver?

    You distribute budget to an order with availability control against
    annual budget and to a projekt with availability control against
    overall budget. Both capital investment measures therefore have
    different settings with regard to the availabiltiy control.
    Adjust the settings for example with regard to the availability
    control in the budget profile of the project to that of the order
    (remove "overall" indicator so that the availability control takes
    places against annual budget). For all projects affected by the budget
    profile change and already budgeted you have to reconstruct the assigned
    values.
    &hints&
    If you want to work at all costs with different settings with regard to
    the availability control for capital investment measures then you can
    change the type of this message (in the standard an "error message"
    appears) into a warning.
    Reconstruct in this case for <zh>every budget change</> on a capital
    investment measure the assigned values for this object as the system
    will otherwise not convey the budget changes to the availability
    control.
    In order to change the type of message choose the work step
    "<DS:SIMG.SIMG_CFMENUORK3OBA5>Change message control</>"
    (application area "BP", message number "741").

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP BP741 - Existence d'options différentes pour le contrôle de disponibilités ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author