How To Fix AP286 - Le budget global est dépassé de &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 286

  • Message text: Le budget global est dépassé de &1 &2

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You are reassigning measures (or appropriation requests), but do
    <ZH>not</> want automatic transfer of the budget from the sending to
    the receiving investment program position (The <LS>Tranfer budget
    </> indicator is not set).
    The indicator for budget distribution of overall values is set on the
    receiving program position. However, the overall budget of the
    reassigned measures (or the overall budget of the measures belonging to
    the reassigned appropriation request) exceeds the total of the
    distributable overall budget on the receiving program position by an
    amount of &V1& &V2&.
    If you make the reassignment in an update run, you will initially have
    an inconsistent overall budget on the receiving program position.
    Therefore, budget distribution from the receiving program position to
    its subordinate measures (or from the measures that belong to the
    subordinate appropriation requests) is not possible until the overall
    budget of the receiving program position is increased by at least &V1&
    &V2&.

    Réponse du système

    The system issues a warning.

    Comment corriger cette erreur?

    When you reassign, you can set the <LS>Transfer budget</> indicator.
    As a result the overall budget of the receiving program position is
    automatically increased to ensure consistency.
    If you do not want to set this indicator, you should manually adjust
    the overall budget of the receiving program position. Increase the
    overall budget by at least &V1& &V2&.

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP AP286 - Le budget global est dépassé de &1 &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author