Message type: E = Error
Message class: AP - Investment program messages
Message number: 261
Message text: Valeurs de pré-budget - affect. impossible car blocage de pré-budget
You tried to assign a measure (or an appropriation request) to a
program position of investment program &V1&/&V2& that has program type
&V4&.
However, there is a planning lock for planning measures (or
appropriation requests) for version &V3& of an investment program of
approval year &V2& and program type &V4&. This means that the total of
the plan values from the assigned measures and appropriation requests
for version &V3& on this investment program is not allowed to change.
But if you assign the measure (or appropriation request), the plan
value would change, since the measure (or request) has plan values for
version &V3&.
The assignment is not allowed.
Reduce the plan value of the measure (or appropriation request) in
version &V3& to zero.
If this error occurred during processing of an appropriation request,
when the request was replaced by a measure, then check all measures
assigned to the appropriation request in version &V3&, and reduce their
plan values to zero.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
AP261
- Valeurs de pré-budget - affect. impossible car blocage de pré-budget ?Get instant SAP help. Start your 7-day free trial now.
AP260
Dossier de demande d'invest. &1 déjà remplacé par une mesure.
Quelle est la cause de ce problème? You want to change or delete an appropriation request that has already been replaced by its assigned measures.R...
AP259
Absence d'autorisation pour ordre &1 dans programme d'invest. affecté
Quelle est la cause de ce problème? You want to change plan values for order &V1&. An investment program position is directly or indirectly...
AP262
Valeurs de pré-budget disponibles - affect. imposs. car absence autoris.
Quelle est la cause de ce problème? You tried to assign a measure (or an appropriation request) to a program position of investment program &V1...
AP263
Ordre de grandeur &1 inconnu
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.