Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 014
Message text: Le cash flow dépasse la longueur maximale dans l'exercice &1.
In year &V1&, the cash flow exceeds the maximum number of pre-decimal
places (&V2&) after the translation from &V3& to &V4&. The maximum
allowed number of pre-decimal places in the planning table is based on
the currency-specific number of decimal places and the scaling factor
that you entered in the planning profile.
It is not possible to transfer the plan values.
Adjust the plan values, so that the difference between revenue and
costs does not exceed &V2& pre-decimal places.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
AO_PLANNING014
- Le cash flow dépasse la longueur maximale dans l'exercice &1. ?Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING013
Total frais généraux/part d'invest. dépasse longueur max. dans ex. &1
Quelle est la cause de ce problème? The total of investment costs and overhead costs entered in the year &V1& exceeds the maximum number of...
AO_PLANNING012
Débordement de zone interne : supprimer les revenus, puis sauvegarder
Quelle est la cause de ce problème? Text copied from message AO_PLANNING 010 During the update of the change document, the system internally identi...
AO_PLANNING015
Total frais généraux dépasse longueur maximale après entrée ds ex. &1
Quelle est la cause de ce problème? As the result of entering overhead costs in year &V1&, the cumulative overhead costs exceed the maximum...
AO_PLANNING016
Total part des investissements trop long après entrée dans exercice &1
Quelle est la cause de ce problème? As the result of entering investment costs in year &V1&, the cumulative investment costs exceed the max...
Cliquez sur ce lien pour rechercher tous les messages SAP.