Message type: E = Error
Message class: AO - Appropriation requests - Master data / Customizing
Message number: 611
Message text: Ordre &1 avec calcul coût revient. Reprise valeur p.-budget imposs.
An EasyCostPlanning cost estimate was already entered for order &v1&.
It is no longer possible for this order to adopt plan values.
Action is terminated.
Check if the cost estimate on the order should be kept. If not, delete
it. After that it is again possible for the order to adopt plan values
from the appropriation request.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
AO611
- Ordre &1 avec calcul coût revient. Reprise valeur p.-budget imposs. ?Get instant SAP help. Start your 7-day free trial now.
AO610
Variante &1 avec calcul coût revient. Reprise val. p.-budget imposs.
Quelle est la cause de ce problème? Variant &v1& has a cost estimate. For variants with a cost estimate, it is only possible for measures t...
AO609
Elément d'OTP &1 avec calcul ct revient. Reprise val. p.-budg. imposs.
Quelle est la cause de ce problème? Costing was already entered in the Project Builder for WBS element &v1& . It is not possible to adopt m...
AO612
Calcul du coût de revient introuvable.
Quelle est la cause de ce problème? A cost estimate, which is not on the database, is assigned to a variant of the appropriation request.Réponse d...
AO613
Début de la réalisation &1 extér. à horizon pré-budg. &2 - &3.
Quelle est la cause de ce problème? Implementation start date &v1& is not within the planning interval from &v2& to &v3&. T...