How To Fix AG001 - Vérifiez paramétrages pr groupe de contrôle &1 et règle de contrôle &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AG - Nachrichten ATP-Server

  • Message number: 001

  • Message text: Vérifiez paramétrages pr groupe de contrôle &1 et règle de contrôle &2

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The system could not determine any checking rules / a valid checking
    group for the availability check.

    Réponse du système

    In order to perform the dynamic availability check, the following two
    parameters need to be maintained in the system:
    Checking rule in Customizing
    Checking rule in material master
    The <ZH>checking rule</> controls which requirements and receipts
    elements are used when the availability check is performed and whether
    the replenishment lead time is to be considered in the chack or not.
    You can use the various checking rules to define different rules for
    the availability check in the business applications (Sales and
    Distribution, Material Requirements Planning, Production Order
    Management, Inventory Management). The checking rules of the individual
    applications are assigned to the checking groups in Customizing. If an
    availability check is to be carried out for a material, then the
    required <ZH>checking group</> is assigned to the material in the
    material master record. The system uses the checking group to find the
    valid checking rule(s) for each application.

    Comment corriger cette erreur?

    Proceed as follows:
    In Customizing for Material Requirements Planning (or Sales and
    Distribution, Production Order Management, Inventory Management), check
    to see whether the cheking rule has been assigned plant-specifically or
    MRP-group-specifically. (In Customizing for Material Requirements
    Planning you can find the checking rule under: <LS>Procurement
    Proposals -> Planned Orders -> Define availability check for
    components</>
    Assign a checking rule as required to the corresponding plant or to the
    MRP group used to plan the material.

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.

    &Note&
    You can find more information about the availability check in Material
    Requirements Planning in the IMG chapter: "Define availability check
    for components".
    Check to see whether a checking group has been entered for the
    component in the material master record (MRP screen 2 or sales/plant
    screen, <LS>Availability check</> field).
    Maintain a checking group if necessary.
    If you do not wish to perform an availability check, assign the
    checking group "No availability check" in the material master record.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP AG001 - Vérifiez paramétrages pr groupe de contrôle &1 et règle de contrôle &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author