Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix 61123 - Erreur lors détermination période de planification pour calendrier &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 123

  • Message text: Erreur lors détermination période de planification pour calendrier &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The system could not determine sufficient planning periods by the
    planning calendar to group requirements by planning calendar periods
    for all the requirements planned in the future.

    Réponse du système

    When a material is planned by using the <ZH>periodical lot size by
    planning calendar</>, sufficient periods must be calculated to group
    requirements by the planning calendar for all requirements.

    Comment corriger cette erreur?

    Rework the planning calendar with which the material was planned, which
    means calculate new planning calendar periods.
    To do this, go to Customizing for MRP, under the activity
    <DS:TRAN.MD26>Change PPC periods</>.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP 61123 - Erreur lors détermination période de planification pour calendrier & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker