Do you have any question about this error?
Message type: E = Error
Message class: 54 - Messages for HR tables
Message number: 271
Message text: Le progr. &1 a la BDL &2, la classe de progr. &3 est valide pr la BDL &4
The &V1& report uses the &V2& logical database. Here, the report is
assigned the &V3& report class, which is valid for the &V4& logical
database.
The system outputs a warning.
Check if the report class should actually be assigned to this report.
If the assignment of report class and report to the PNPCE logical data
base does not agree, the wrong parameters that are specific to the PNPCE
may be incorrectly used during the program run.
If necessary, copy the report class if you want to use it for PNP and
PNPCE reports.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
54271
- Le progr. &1 a la BDL &2, la classe de progr. &3 est valide pr la BDL &4 ?Get instant SAP help. Start your 7-day free trial now.
54270
Indiquez un plan de roulement périodique
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
54269
Erreur lors de la création de l'en-tête
Quelle est la cause de ce problème? The generation of the infotype header was now successful. One of the specified fields may be invalid. &SYTE...
54272
Prog. & a LDB <> PNP
Quelle est la cause de ce problème? Only HR reports with logical database PNP can be used to create logs for report starts. The logical database us...
54273
Prog. & a LDB <> PNP
Quelle est la cause de ce problème? HR reports without access to the PNP logical database must use the RMAC module RP-MODIY-RSCREEN-x instead.Répo...
Cliquez sur ce lien pour rechercher tous les messages SAP.