Do you have any question about this error?
Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 109
Message text: Imp. ut. fiche instr. (dest. rec. ctrle &1) ds phase &2 pr enreg. de lot
It was specified in the order type-dependent parameters for order type
&V4& that a <LS>Batch record is required</> for the process order.
Destination type &V3& was defined for control recipe destination &V1&
of phase &V2&. This destination generates a browser-based PI sheet.
The batch record (transaction COEBR) can only process the ABAP
list-based PI sheet and not the browser-based PI sheet. For this
reason, the browser-based PI sheet cannot be documented. All other
documents can, however, be used.
If the documentation of the browser-based PI sheet is not required,
&V3& can be used as the destination type. Otherwise the ABAP list-based
PI sheet (destination type 1) must be used.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
40109
- Imp. ut. fiche instr. (dest. rec. ctrle &1) ds phase &2 pr enreg. de lot ?Get instant SAP help. Start your 7-day free trial now.
40108
Erreur dans contrôle des autorisations activité, type ordre et division
Quelle est la cause de ce problème? An error occurred during an authorization check for changing or displaying a process order because a required v...
40107
Ordre &1, opération &2 : ressource différente de la recette autorisée
Quelle est la cause de ce problème? You have created a process order that requires approval for an approved recipe. A resource has, however, been a...
40110
Marquez au moins un type de poste pour les composants
Quelle est la cause de ce problème? In the section <LS>Components with item types</>, you have not selected any item types.Réponse du ...
40111
Marquez au moins une entrée dans la section "Affectation de lot"
Quelle est la cause de ce problème? You have not selected anything in the <LS>Batch assignment</> area.Réponse du système For the sc...
Cliquez sur ce lien pour rechercher tous les messages SAP.