Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UCF5 - Messages for Two-Sided Elimination
Message number: 010
Message text: La característica &1 no puede asignarse al componente &2 (corríjalo)
Characteristic &V1& plays the role of a consolidation unit to which a
partner characteristic has been assigned. The system automatically
makes the assignment of such characteristics in the differential rows,
that is, in accordance with the the characteristic values assigned in
the elimination data, and the strategy for posting differences that is
to be used. Thus, the assignment of characteristic &V1& to layout
component &V2& is not feasible.
The layout definition has an error and cannot be saved.
Revoke the assignment of characteristic &V1& to layout component &V2&.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
UCF5010
- La característica &1 no puede asignarse al componente &2 (corríjalo) ?Get instant SAP help. Sign up for our Free Essentials Plan.
UCF5009
Para método &1, paso &2 faltan imputaciones para diferencias de moneda
¿Qué causa este problema? Each method step requires an assignment for currency-related differences if the task that is used by the method performs ...
UCF5008
Para método &1, paso &2 faltan imputaciones para Otras diferencias
¿Qué causa este problema? Each method step requires an assignment for Other Differences. Step &V2& of method &V1& has no assignment...
UCF5011
La característica &1 no puede asignarse al componente &2 (corríjalo)
¿Qué causa este problema? Characteristic &V1& is the key field for key figure &V3&. The system automatically makes the assignments ...
UCF5012
En método &1 faltan los datos de clase de tipo de cambio (corríjalo)
¿Qué causa este problema? Method &V1& has no exchange rate indicator. Depending on how this method is used in a task, the lack of an exchan...
Haga clic en este enlace para buscar todos los mensajes de SAP.