Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: STPC - Messages for Valuation of Confirmations
Message number: 103
Message text: Recurso &1 no asignado al evento &2
No link was established between the iPPE resource and
<DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.
The system cannot determine any costs for the activity in Short-Term
Production Costs.
In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
<ZK>operating facilities</> and choose <ZK>Load.</> Choose the
<ZK>Costs</> tab and enter a reference to the CO-relevant master data
<DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
<DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
<DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
selecting the corresponding data. The assignment of this CO master data
to the iPPE resource gives the iPPE resource a price (activity price)
which is then used both in costing and for confirmation.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
STPC102 No se ha podido determinar período p.fe.contabiliz.&1 en sociedad CO &2
¿Qué causa este problema? The system cannot determine a period in controlling area &2 for posting date &1.Respuesta del sistema Without th...
STPC101 No existe colector de costes del producto &1/&2/&3
¿Qué causa este problema? The <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> used for confirmation (material &...
STPC104 No existe segmento de valoración para material &1
¿Qué causa este problema? Material &1 cannot be valuated because it has no valuation segment. The valuation segment for material &V1&, ...
STPC105 No existe segmento de valoración para material &1
¿Qué causa este problema? The material master has no accounting or costing view. It is therefore not possible to valuate material &V1& in p...
Haga clic en este enlace para buscar todos los mensajes de SAP.