Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix STPC103 - Recurso &1 no asignado al evento &2


STPC103 - Overview

  • Message type: E = Error

  • Message class: STPC - Messages for Valuation of Confirmations

  • Message number: 103

  • Message text: Recurso &1 no asignado al evento &2

  • Show details Hide details
  • ¿Qué causa este problema?

    No link was established between the iPPE resource and
    <DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.

    Respuesta del sistema

    The system cannot determine any costs for the activity in Short-Term
    Production Costs.

    ¿Cómo arreglar este error?

    In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
    <ZK>operating facilities</> and choose <ZK>Load.</> Choose the
    <ZK>Costs</> tab and enter a reference to the CO-relevant master data
    <DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
    <DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
    <DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
    selecting the corresponding data. The assignment of this CO master data
    to the iPPE resource gives the iPPE resource a price (activity price)
    which is then used both in costing and for confirmation.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


STPC103 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker