How To Fix STPC103 - Recurso &1 no asignado al evento &2


STPC103 - Overview

  • Message type: E = Error

  • Message class: STPC - Messages for Valuation of Confirmations

  • Message number: 103

  • Message text: Recurso &1 no asignado al evento &2

  • Show details Hide details
  • ¿Qué causa este problema?

    No link was established between the iPPE resource and
    <DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.

    Respuesta del sistema

    The system cannot determine any costs for the activity in Short-Term
    Production Costs.

    ¿Cómo arreglar este error?

    In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
    <ZK>operating facilities</> and choose <ZK>Load.</> Choose the
    <ZK>Costs</> tab and enter a reference to the CO-relevant master data
    <DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
    <DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
    <DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
    selecting the corresponding data. The assignment of this CO master data
    to the iPPE resource gives the iPPE resource a price (activity price)
    which is then used both in costing and for confirmation.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP STPC103 - Recurso &1 no asignado al evento &2 ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant