Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 312
Message text: Programación órdenes previsionales p.material &1 versión &2 no ejecutada
The planned order was not scheduled.
This may be due to one of the following reasons, for example:
The scheduling level (detailed or rate-based planning) you used to
access the planning table and the one used for scheduling are not the
same.
No suitable routing could be found.
One possibility of finding out what is causing the problem is:
To access the planned order from the detailed dialog box in the table
via "Change" and reschedule the planned order. Check the scheduling log
by choosing "Goto --> Scheduling log". More information is displayed in
the log's warning or error messages.
You define the scheduling levels for the various types of planned
orders in Customizing.
<DS:TRAN.OPU5>Proceed with function</>
You must enter the routings in the production version in the material
master record (MRP 4 screen) according to the scheduling level settings
in Customizing (determine scheduling and capacity requirements via
detailed or rate-based planning).
<DS:TRAN.MM02>Proceed with function</>
If you have made any changes, you have to restart the planning table to
activate the changes.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
REMPT312
- Programación órdenes previsionales p.material &1 versión &2 no ejecutada ?Get instant SAP help. Start your 7-day free trial now.
REMPT311
Problemas al programar órdenes previsionales p.material &1 versión &2
¿Qué causa este problema? Problems occurred when scheduling the planned order. This may be due to one of the following reasons, for example: The sc...
REMPT310
Error de programación: &
¿Qué causa este problema? A problem occurred when determining the column in which the planned order is to be created.¿Cómo arreglar este error? ...
REMPT313
Niveles de programación no actualizados en Customizing
¿Qué causa este problema? Problems occurred when scheduling the planned order. This may be as a result of the following: You have not maintained Cu...
REMPT314
No se han determinado necesidades de capacidad (véase Customizing)
¿Qué causa este problema? No capacity requirements were created for the planned order. This may be as a result of the following: It is set in Custo...
Haga clic en este enlace para buscar todos los mensajes de SAP.