Do you have any question about this error?
Message type: E = Error
Message class: QPMS - Planning for Multiple Specifications and Parameter Chars
Message number: 014
Message text: La asignación de plan de material pura no puede borrarse
The existing material assignment to the inspection plan cannot be
deleted, because material-task list assignments still exist for the
multiple specifications.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
When an inspection lot is created for an inspection plan with multiple
specifications, the system needs the <ZH>material-only assignment</> so
that it can find and use the inspection plan. Therefore, this assignment
cannot be deleted if there are still material-task list assignments with
objects for the multiple specification.
First, delete all material-task list assignments that contain objects
for the material specification. That is, <ZH>the</> material-task list
assignments for which an object type has been specified. Then, delete
the material-only assignment for the inspection plan.
Alternatively, you can also delete all material-task list assignments in
one step.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
QPMS014
- La asignación de plan de material pura no puede borrarse ?Get instant SAP help. Start your 7-day free trial now.
QPMS013
Plan no previsto para especificaciones múltiples, ajustar asignaciones
¿Qué causa este problema? In the existing material-task list assignments for the existing inspection plan, an object type for multiple specificatio...
QPMS012
La asignación de plan de material es incompleta
¿Qué causa este problema? In the existing material-task list assignments for the existing inspection plan, the object type for multiple specificati...
QPMS015
No es posible la especificación múltiple para asignación pura de material
<ZH>&CAUSE&</> The existing inspection plan has been defined for <DS:DE.Q_MS_FLG>multiple specifications</>. You want...
QPMS016
Especificaciones múltiples no permitidas en planes inspección c/pto.insp.
¿Qué causa este problema? Standard values for multiple specifications <ZH>cannot</> be entered in inspection plans with inspection poin...
Haga clic en este enlace para buscar todos los mensajes de SAP.