How To Fix PV457 - La necesidad total de & eventos sólo se ha podido cubrir con &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PV - Training and Event Management

  • Message number: 457

  • Message text: La necesidad total de & eventos sólo se ha podido cubrir con &

  • Show details Hide details
  • ¿Qué causa este problema?

    Your demand for business events is greater that the number of events
    you can create in the planning. This is becuase of the planning
    options.

    ¿Cómo arreglar este error?

    If you wish to change the planning options, cancel the log and deselect
    the option 'Resource requirements covered'. The business events will
    then be created despite missing resources.
    A second possibility open to you is to reduce the number of resources
    flagged as 'required' in the 'Presettings resources/resource types' and
    to start the planning again.
    As a third alternative, you can assign new resources to the critical
    resource types.
    You can, however, accept the smaller number of business events proposed
    and carry out the planning for the remaining demand at a later time.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP PV457 - La necesidad total de & eventos sólo se ha podido cubrir con & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker