How To Fix PSZ1006 - El elemento PEP &2 no está asignado a la entidad CP &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ

  • Message number: 006

  • Message text: El elemento PEP &2 no está asignado a la entidad CP &1

  • Show details Hide details
  • ¿Qué causa este problema?

    WBS element &V2& is not assigned to company code &V3&. The company code
    is not assigned to FM area &V1&. Joint planning in manual payment
    planning is only possible for WBS elements which are assigned to the
    same FM area.
    The FM area regarded by the system as valid is the FM area from the WBS
    element selected first from the interval or group.

    Respuesta del sistema

    The system selects only the WBS elements assgined to FM area &V1&. If
    no WBS element is so assigned by way of the company code, processing
    stops.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP PSZ1006 - El elemento PEP &2 no está asignado a la entidad CP &1 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author