How To Fix PPH_MRP146 - No se permite planificación con necesidad pronóstico en MRP Live en HANA


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 146

  • Message text: No se permite planificación con necesidad pronóstico en MRP Live en HANA

  • Show details Hide details
  • ¿Qué causa este problema?

    A forecast exists for the material and the forecast requirements are to
    be considered in the planning run. However, the MRP Live on HANA run
    does not support the planning of forecast requirements.
    Note:
    Do not confuse forecast requirements with planned independent
    requirements. MRP Live on HANA supports the planning of planned
    independent requirements. With regard to forecasts, MRP Live on HANA
    supports the following scenarios:
    Execution of a forecast for the total consumption. The forecast itself
    is not relevant to planning but can be used as the basis for planned
    independent requirements which are included in the MRP Live on HANA run.
    Execution of a forecast for the calculation of the reorder point and
    safety stock for consumption-based planning.

    Respuesta del sistema

    The MRP Live report plans the material using classic MRP.

    ¿Cómo arreglar este error?

    The planning run using classic MRP may be slower than the planning run
    using MRP Live on HANA. To enable the planning of the material in MRP
    Live on HANA, proceed as follows:
    Check whether the material was included in a forecast recently. If the
    material was only included in forecasts in the past for which forecast
    requirements still exist, they will prevent the material from being
    included in the MRP Live on HANA run. In this case, delete the forecasts
    or select an MRP procedure that does not take account of the forecast.
    If the forecast is executed for the total consumption and included in
    the planning run (for example, for the MRP procedure ?VV?), you can
    define a similar process by setting the planning strategy group ?10?
    (make-to-stock) in the material master and selecting an MRP procedure
    that enables the execution of the forecast for the total consumption
    whereby the forecast is not relevant to planning. Then you can use the
    forecast as the basis for planned independent requirements which can be
    included in the MRP Live on HANA run.

    Procedimiento para Administradoras de Sistemas

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP PPH_MRP146 - No se permite planificación con necesidad pronóstico en MRP Live en HANA ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker