How To Fix PPC0043 - Actividades de fabricación se vuelven a determinar


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPC0 - Messages for PP Confirmation

  • Message number: 043

  • Message text: Actividades de fabricación se vuelven a determinar

  • Show details Hide details
  • ¿Qué causa este problema?

    The <ZK>Production Activities</> screen has been accessed before. The
    production activities are determined again because of subsequent changes
    to quantities (quantity, unit of measure or cancellation indicator) or
    because of changes to key information for the reporting points to be
    confirmed. Changes that were made to production activities before and
    unplanned production activities are lost.

    Respuesta del sistema

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    ¿Cómo arreglar este error?

    Check the production activities again and, if necessary, change or add
    data for the production activities before saving the confirmation.

    Procedimiento para Administradoras de Sistemas


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP PPC0043 - Actividades de fabricación se vuelven a determinar ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author