Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 304
Message text: Estrategia de reposición ya no se corresponde con datos creados
The replenishment strategy of this control cycle has been subsequently
changed. The indicator "from other plant" in Customizing in the
replenishment strategy, with which the control cycle was created, has
been deleted.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
You have the following options:
You leave the control cycle maintenance with "cancel", go to kanban
Customizing and there reset the indicator "from other plant" in the
control cycle replenishment strategy.
In the control cycle maintenance select a new replenishment strategy
for this control cycle.
You no longer want a cross-plant control cycle but you still want to
maintain it with the same strategy. In this case you retain the
current replenishment strategy and must simply save the crontol cycle
on leaving the control cycle maintenance.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
PK304
- Estrategia de reposición ya no se corresponde con datos creados ?Get instant SAP help. Start your 7-day free trial now.
PK303
En el perfil de cálculo kanban &1 falta especific.clave de distribución
¿Qué causa este problema? You have entered a calculation profile in the control cycle that smooths the requirements using a distribution function. ...
PK302
Introduzca un valor numérico (superior o igual a cero)
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
PK305
En esta estrategia de reposición no se debe imputar contrato
¿Qué causa este problema? You have chosen a replenishment strategy, with which material withdrawal is posted to the cost center. Your outline agree...
PK306
Fije indicador de material a granel en maestro de materiales
¿Qué causa este problema? You have selected a replenishment strategy with material consumption <LS>to cost center</>. For this strategy...
Haga clic en este enlace para buscar todos los mensajes de SAP.