Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 232
Message text: No se ha encontrado el nodo descendiente del nodo NODE_ID = &
One of the tasks refers to a subsequent task that does not
exist. This is not
possible.
Technical information: All tasks with the same task group are connected
to one another in a chain. The content of the
NSIBLING_ID field refers to the
NODE_ID node of the next task in the chain.
If none of the tasks in the task group have this NODE_ID,
the task list is faulty.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
PEP231 Los nodos NODE_ID = &1 y &2 finalizan los dos el grupo de tareas
¿Qué causa este problema? One of the task groups has more than one final task. This is not possible. Technical information: All tasks with the same...
PEP230 No se pasa al grupo de tareas del nodo NODE_ID = &
¿Qué causa este problema? The task group that this task belongs to is not triggered in the task list. Technical information: The task group belongs...
PEP233 El nodo descendiente del nodo NODE_ID = & está en otro grupo de tareas
¿Qué causa este problema? One of the tasks in the task group refers to a subsequent task that does not appear in the same task group. This is not p...
PEP234 Hay un loop en el grupo de tareas del NODE_ID = &
¿Qué causa este problema? One of the tasks in the task group refers to a subsequent task that refers back to the original task, possibly several st...
Haga clic en este enlace para buscar todos los mensajes de SAP.