Do you have any question about this error?
Message type: E = Error
Message class: NAA - Subsequent settlement (Purchasing)
Message number: 641
Message text: La fecha de actualización &1 se encuentra en un período ya liquidado
Update date &V1& falls in a period (&V3& to &V4&) of arrangement &V2&
for which settlement accounting has already been performed.
The update date is changed to the start date or end date of the next
period for which settlement accounting is due.
Please note that the update date has changed, and if necessary take
account of the resulting changes to the assignment of business volume
data to a period (in the case of arrangements settled periodically).
This procedure ensures realtime settlement accounting for business
volumes.
The document date of the material document or invoice verification
document is used as the update date in the case of updating at the time
of goods receipt or invoice verification, or the delivery date of the
schedule line is used as the update date in the case of data updated
from the purchase order/delivery schedule. In the case of Settlement
Management documents (supplier billing documents and settlement
documents), the posting date (billing date) is used as the update date.
In some cases, the update date is changed to the start or end date of
the arrangement validity period if the original date is not within the
arrangement validity period (e.g. as a result of a data input error).
In the case of arrangement settled periodically, if the update date
falls in a period for which settlement accounting has already been
performed, business volumes are assigned to the next period for which
settlement accounting is due. The update date is changed accordingly.
This procedure ensures realtime inclusion of business volumes during
subsequent settlement.
For invoice verification documents entered in Release 3.0, the posting
date of the invoice verification document is used for the subsequent
update of business volume data. The "Document date" field in the PO
history is empty in the case of these documents.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
NAA641
- La fecha de actualización &1 se encuentra en un período ya liquidado ?Get instant SAP help. Start your 7-day free trial now.
NAA640
La fecha de actualización &1 está fuera del período de acuerdo
¿Qué causa este problema? Update date &V1& is outside the validity period of arrangement &V2&.Respuesta del sistema The update dat...
NAA639
Se ha tomado la fecha d.contab./facturación &1 como fecha d.actualización
¿Qué causa este problema? The posting/billing date &V1& was adopted as the update date.Respuesta del sistema El sistema emite un mensaje d...
NAA642
La fecha de actualización se ha adaptado a la fecha &1
¿Qué causa este problema? The update date is changed to date &V1&.Respuesta del sistema The update date is changed to date &V1&. T...
NAA643
La cl.de cond.&1 se utiliza en el esquema d.cálculo &2 en un gp.exclusión
¿Qué causa este problema? Condition type &V1& is used in an exclusion group with reference to calculation schema &V2& (usage &V...
Haga clic en este enlace para buscar todos los mensajes de SAP.