Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 425
Message text: &1: &2 (P2)
The system could not find a valid routing when scheduling via the
routing or the routing is incorrect.
This exception is displayed in the MRP list and the current
stock/requirements list.
Check the routing for all the scheduling levels set in Customizing.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MD425
- &1: &2 (P2) ?Get instant SAP help. Start your 7-day free trial now.
MD424
&1: &2 (P1)
¿Qué causa este problema? The scheduling data in the Customizing settings are not consistent for the material. Possible reasons, for example: detai...
MD423
&1: &2 (U5)
¿Qué causa este problema? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.Respuesta del...
MD426
&1: &2 (P3)
¿Qué causa este problema? In Customizing, no specification has been made to allow the adjustment of the order start date to the production start da...
MD427
&1: &2 (P4)
¿Qué causa este problema? The production finish date calculated using the routing lies after the order finish date that was calculated using the in...
Haga clic en este enlace para buscar todos los mensajes de SAP.