How To Fix MD425 - &1: &2 (P2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 425

  • Message text: &1: &2 (P2)

  • Show details Hide details
  • ¿Qué causa este problema?

    The system could not find a valid routing when scheduling via the
    routing or the routing is incorrect.

    Respuesta del sistema

    This exception is displayed in the MRP list and the current
    stock/requirements list.

    ¿Cómo arreglar este error?

    Check the routing for all the scheduling levels set in Customizing.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP MD425 - &1: &2 (P2) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:
  • MD424 &1: &2 (P1)
    ¿Qué causa este problema? The scheduling data in the Customizing settings are not consistent for the material. Possible reasons, for example: detai...

  • MD423 &1: &2 (U5)
    ¿Qué causa este problema? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.Respuesta del...

  • MD426 &1: &2 (P3)
    ¿Qué causa este problema? In Customizing, no specification has been made to allow the adjustment of the order start date to the production start da...

  • MD427 &1: &2 (P4)
    ¿Qué causa este problema? The production finish date calculated using the routing lies after the order finish date that was calculated using the in...

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author