Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 419
Message text: &1: &2 &3 (U1)
In the rescheduling check, the system calculated a date to which the
receipt is to be brought forward (rescheduled in) to avoid a material
shortage.
The rescheduling date displayed is the date on which the receipt is to
be available for MRP. This includes the goods receipt processing time.
If this is not zero, this information is displayed as well as the
required goods receipt date.
This exception is displayed in the MRP list, and in the
stock/requirements list.
Check whether the receipt can be brought forward.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MD419
- &1: &2 &3 (U1) ?Get instant SAP help. Start your 7-day free trial now.
MD418
&1: &2 &3 (V3)
¿Qué causa este problema? The order proposal was manually changed in the single-item planning run. El sistema emite un mensaje de error y no le per...
MD417
&1: &2 (V2)
CAUSE& The order proposal BOM was re-exploded in the planning run. El sistema emite un mensaje de error y no le permitirá continuar con esta tra...
MD420
&1: &2 &3 (U2)
¿Qué causa este problema? In the rescheduling check, the system calculated a date to which the receipt is to be moved out (rescheduled out) to avoi...
MD421
&1: &2 &3 (U3)
¿Qué causa este problema? There is no requirements for this receipt. It should be reversed to avoid unnecessary warehouse stock.Respuesta del siste...
Haga clic en este enlace para buscar todos los mensajes de SAP.