Do you have any question about this error?
Message type: E = Error
Message class: M8 - Invoice Verification/Valuation
Message number: 191
Message text: El periodo ha sido adaptado a la fecha de contabilización
You changed an entry in the field <LS>Posting date</> or the field
<LS>Period</> so that the posting date is no longer in the period. This
is only permitted if the posting date is in the last period of the
fiscal year and the period specified is a special period.
The system entered in the field <LS>Period</> the period in which the
posting date falls.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
M8191
- El periodo ha sido adaptado a la fecha de contabilización ?Get instant SAP help. Start your 7-day free trial now.
M8190
Introduzca un proveedor
¿Qué causa este problema? Based on your entries in the <ZH>Allocation</> area, the system tries to determine the supplier. If this is n...
M8189
La asignación carta porte sólo está prevista en costes indirectos planif.
¿Qué causa este problema? You have entered a bill of lading, but have not selected the <LS>Planned delivery costs</> field. <LS>B...
M8192
Verifique si la fecha del documento está en el futuro
¿Qué causa este problema? The document date that you have entered is in the future.Respuesta del sistema The system allows entry of a future date:...
M8193
Fechas doc.y contab.se encuentran en diferentes ejercicios
¿Qué causa este problema? The document date you entered is in a different fiscal year to the posting date.Respuesta del sistema The system allows ...
Haga clic en este enlace para buscar todos los mensajes de SAP.