Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 113
Message text: Sin recursos del sistema para paso paralelo &1
You have scheduled the template allocation as a background job with the
server group &V3&. This leads to parallel processing. The scheduling of
the prallel step &V1& failed after &V2& attempts due to a lack of
system resources in the server group &V3&.
The parallel processing cannot be completed or is not possible.
Repeat the template allocation (if appropriate, only for the affected
selection packages) and choose another server group that has more
system resources.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KW113
- Sin recursos del sistema para paso paralelo &1 ?Get instant SAP help. Start your 7-day free trial now.
KW112
Error en el sistema: &1 al recibir paso paralelo &4
¿Qué causa este problema? When parallel step &V4& was received, a system error occurred: Error text: &V2&&V3&Respuesta del ...
KW111
Error en el sistema: &1 al planificar paso paralelo &4
¿Qué causa este problema? When you scheduled parallel step &V4&, a system error occurred. Error text: &V2&&V3&Respuesta del...
KW114
No es posible determ.ningún tamaño paquete adecuado p.proceso paralelo
¿Qué causa este problema? You have scheduled the template allocation in Profitability Analysis as a background job and specified a server group. Th...
KW115
No existen niveles de integración adecuados
¿Qué causa este problema? No suitable summarization level for template allocation to profitability analysis.Respuesta del sistema The system tries...
Haga clic en este enlace para buscar todos los mensajes de SAP.