Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 102
Message text: Para el proceso emp.& no está prevista la facturación de actividad
Business process &v1& is not supported for activity allocation.
The business process cannot participate in activity allocation in
period(s) &v2&.
If needed, maintain the following in <DS:TRAN.CP02>master data
maintenance</> (tab "allocation"): the
<DS:GLOS.36C0429B3E0C535AE10000009B38F985>process driver</>, and the
<DS:GLOS.35C5721770BF6B31E10000009B38F9B6>allocation type.</>
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KW102
- Para el proceso emp.& no está prevista la facturación de actividad ?Get instant SAP help. Start your 7-day free trial now.
KW101
Componente contabilidad de costes por procesos inactivo
¿Qué causa este problema? The Activity-Based Costing (CO-ABC) component is not active for controlling area <ZH>&V2&</> and fisc...
KW100
**** Mensajes CO-ABC de imputación
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
KW103
Las relaciones de imputación contienen ciclos
¿Qué causa este problema? With the explosion of the process structures, the system found allocation relationships containing loops. The explosion o...
KW104
El receptor & no tiene ninguna cantidad real/plan
¿Qué causa este problema? No actual or planned quantity could be determined for value type &V3& for receiver object &V1& in fiscal ...
Haga clic en este enlace para buscar todos los mensajes de SAP.