Do you have any question about this error?
Message type: E = Error
Message class: KK -
Message number: 748
Message text: Cálculo mixto del coste en nivel de desglose &1 p.material &2 centro &3
The material cost estimate is to be exploded in explosion level &v1&
for a mixed cost estimate (material &v2& plant &v3&). However, material
explosion does not support the explosion of a mixed cost estimate.
The material cost estimate is not exploded.
The maximum explosion level is indicated in the last logged message for
material explosion. Material explosion can only be performed up to this
level.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KK748
- Cálculo mixto del coste en nivel de desglose &1 p.material &2 centro &3 ?Get instant SAP help. Start your 7-day free trial now.
KK747
Centro &2 no existe en la sociedad CO &1
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
KK746
Los gastos generales no han sido determinados
¿Qué causa este problema? The itemization does not contain any overhead costs because neither overhead rates nor process costs were calculated. Pos...
KK749
Existe cálculo mixto del coste: Máximo &1 nivel(es) de desglose posible
¿Qué causa este problema? The material cost estimate is to be exploded for one or more mixed cost estimates. However, material explosion does not s...
KK750
***** Mensajes referencia de utilización de componentes **********
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.